Unread postby gwgardner » Sun Oct 30, 2016 4:55 pm

I've been watching tutorials and reading about semaphores. There are a couple of things I don't understand so far:

1) see attached screenshot of the GX asset semaphores, how are the 'manual' semaphores intended to be used/placed on the route?

2) see attached screenshot of the GN assets, in which I'm unsure what the 'E' designation means, as in 1H 1T 1E

Thanks for any help.
You do not have the required permissions to view the files attached to this post.
gwgardner
 
Posts: 701
Joined: Tue Jan 25, 2011 2:34 pm

Re: help request concerning semaphores

Unread postby GreatNortherner » Mon Oct 31, 2016 12:43 pm

I can't speak for Rick's models, but you should be able to determine which signals goes where by double clicking them in the route editor on the RWA route and checking which model is used where.

For my signals, I'm using standard Kuju (Cajon Pass) signals naming and scripting here, so the E links are the yard-entry/end-track links like on the Kuju signals.
User avatar
GreatNortherner
 
Posts: 1584
Joined: Sun Feb 15, 2009 11:19 am
Location: Czech Republic

Re: help request concerning semaphores

Unread postby ricksan » Mon Oct 31, 2016 12:44 pm

The GX "Manual" semaphores are the ones with a bell crank at the base representing manually operated signals. I used four of them on the RW&A at the 2x2 cross intersection next to Waterton tower. A more complete setup would have included a network of control rods emanating from the tower. Although the signals are called "manual" they're actually scripted the same as the main line semaphores.
ricksan
Forum Mod
 
Posts: 311
Joined: Fri Feb 13, 2009 10:55 am
Location: Bandon, OR USA

Re: help request concerning semaphores

Unread postby gwgardner » Tue Nov 01, 2016 10:21 am

Thanks much for the explanations. I'll be using the manual semaphore then at Tower 55. I spent all day yesterday trying to figure out how to signal that crossing, and it completely stumped me.
gwgardner
 
Posts: 701
Joined: Tue Jan 25, 2011 2:34 pm

Re: help request concerning semaphores

Unread postby gwgardner » Tue Nov 01, 2016 10:26 am

Another questions, if I may:

1) What are the 1H 0T semaphores for?

2) What are the 2H 1T for?

3) What are the semaphores used for that have 4 or more tracks? Like 3H 6T?

I do fiddle with these to try to figure them out, and looking at the RWA route is a big help, but for some I'm stumped. Thanks for any help. I guess I should go look at the Kuju usage also.
gwgardner
 
Posts: 701
Joined: Tue Jan 25, 2011 2:34 pm

Re: help request concerning semaphores

Unread postby ErikGorbiHamilton » Tue Nov 01, 2016 11:40 am

gwgardner wrote:Another questions, if I may:

1) What are the 1H 0T semaphores for?

2) What are the 2H 1T for?

3) What are the semaphores used for that have 4 or more tracks? Like 3H 6T?

I do fiddle with these to try to figure them out, and looking at the RWA route is a big help, but for some I'm stumped. Thanks for any help. I guess I should go look at the Kuju usage also.



1H 0T Is like a block Signal. Those are the ones i use when putting signals on a line.