I was able to come up with something using the HIS Hanover assets as per the attached.
Dumper(1).jpg
1. I started off by leveling the loading area below the track.
2. I quickly measured the length of this structure in Google Earth which is about 10m and changed the actual structure track to bridge ties.
3. I then used the offset tool set at 0.01 and added a 10m HNV RR Bridge Girder from the bridge section using linear object mode which will support the track. Moving it vertically till it was snug with the underside of the ties.
Dumper(2).jpg
4. I then used the offset tool set at 0.01 and added a 10m HNV Bridge Walkway 2 sides section using linear object mode. I adjusted the height down so it sat snug on top of the tracks.
Dumper(3).jpg
5. I then placed HNV Bridge Abut 3 Embank on opposites ends of the bridge structure.
Dumper(5).jpg
6. I then proceeded to build the retaining wall using more HNV Bridge Abut 3 Embank sections which matched the rough dimensions I measured from Google Earth
Dumper(6).jpg
You do not have the required permissions to view the files attached to this post.