MattW wrote:At no time was the Hellgate bridge ever not electrified. I do hope they include Grand Central, but I'm afraid they probably won't. Though I'm glad to see that they'll pretty much have to include Sunnyside Yard.
It's probably too much to hope, but it would be nice if this became a true extension of the NEC, and existing NEC users were given a discount on the addition.
That would be amazing... we could finally lay up our trains at Sunnyside after terminating at NYC lol.. or even simulate a turn around with the loop track lol.
EDIT:
Also, the developers at railworks commented on the lack of catenary:
It is an early production image. We are still working on it.