Willamette Pass

Discussion about RailWorks route design.

Re: Willamette Pass

Unread postby OregonRider » Sun Aug 07, 2016 7:52 pm

I am fimilar with ive used it for about 8 years but i haven't even touched the route in the editor for the last week and it was fine then i've hade this problem before when my computer abruptly shuts down and last night some water spilled on it and i was working on the route. Luckily no other route we ruined. Its not just this problem i have when my computer shuts down abruptly i also have a problem with large sections of track just dissapering i've learned to live with it though.
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby OregonRider » Sun Aug 07, 2016 8:10 pm

artimrj wrote:
OregonRider wrote:
buzz456 wrote:" aokridge is beging"

Huh?

Sorry but i typed that on a phone touch screen witch i am horrible with


Im not sure what Bob Artim means but if he wants to help i need re-paints of GP-15,GP-50,SW1500, and justin correls GP38-2. i need them all in http://www.brian894x4.com/images/WVRheader2.gif . If he meant help that would be great since i can't re-paint on my computer. I understand if thats not what he meant though
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby Bananarama » Sun Aug 07, 2016 8:47 pm

OregonRider wrote:I am fimilar with ive used it for about 8 years

Then it should take you less than an hour to rectify. Frequent backups help.
Cheers!
Marc - 3DTrains

Image
User avatar
Bananarama
 
Posts: 2749
Joined: Sat Feb 14, 2009 1:17 am
Location: Another Planet

Re: Willamette Pass

Unread postby OregonRider » Sun Aug 07, 2016 8:50 pm

Hack wrote:
OregonRider wrote:I am fimilar with ive used it for about 8 years

Then it should take you less than an hour to rectify. Frequent backups help.

I've learned that, unfortunatly the hard way
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby OregonRider » Sun Aug 07, 2016 8:53 pm

Currently im fixing all the bridges and its coming along fast and nice
Im using stevens pass assets
You do not have the required permissions to view the files attached to this post.
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby OregonRider » Mon Aug 08, 2016 11:34 am

OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby OregonRider » Mon Aug 08, 2016 11:25 pm

The tracks are all messed up again even after uninstalling and reinstalling but this time ill just take the extra time to fix it it will probably take a while but ill
alternate between the tracks and texturing.
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Re: Willamette Pass

Unread postby OregonRider » Tue Jan 24, 2017 5:44 pm

I have good news a guy named derek contacted me via my website and had a question about how to install my update. And while typing my gloomy response that the route hadn't been worked on for months and he should stick with the original, i realized just how much i wanted done. So the good news is that along with sky hill and coosbay Willamette pass is getting a higher priority rating. That means that it will be worked on regularly but with two possibly three other routes also being worked on i can't work on it to regularly. But it WILL GET DONE !*YAAA*!
OregonRider
 
Posts: 157
Joined: Tue Jul 26, 2016 12:19 am
Location: Roseburg/Winston, Oregon

Previous

Return to Route Design

Who is online

Users browsing this forum: No registered users and 1 guest