Who is building what ?

Discuss almost anything about RailWorks.

Who is building what ?

Unread postby imnew » Sun Dec 30, 2012 8:34 am

Hi guys.

Ive been thinking, yup my head hurts *!!wink!!* Fact is, so many have left us, *!sad!* But hey, dont forget, alot of new folks have joined us !!*ok*!! Im sure there are far more routebuilders and content builders out there. Why not let your work be known with the rest of us ? Are you going the fictional way or the prototypical way? Payware or freeware ? Let this be more of an informative thread rather than a discussion ! There are so many different threads on who is doing what, lets concentrate that information here.

Not a screenshots thread please, if you have screenshots of your work then excellent ! Please include a link to the thread that contains your work in progress ( if you have one )..

Lets see what is being created by the many simmers out there, please join in ! ( Note, thread will be online for a while, if there are no takers I will ask papa to get rid of it )

So, railworks veterans from a far and all you new guys, please join in and let us know what you are all up to !!det!!

I will start.

Route: Conrail Chicago Terminal / Norfolk Southern Dearborn Division.
Route: Blue Island Illinois ( Chicago ) to Elkhart Indiana
Length: Not sure yet
Prototypical: DEM terrain, RWDecal. CSX and NS track charts along with cabrides and regular dvds where available.
Completion: Getting closer to South Bend and Elkhart Indiana. ( updated September 24th )

Link to screenshots and work in progress threads.

viewtopic.php?f=10&t=3524&p=32517&hilit=blue+island#p32517 Shows only Blue Island
viewtopic.php?f=31&t=4160 Shows current progress
Last edited by imnew on Tue Sep 24, 2013 1:59 am, edited 1 time in total.
Intel Core I7-7770K, ZOTAC GTX 1080 Ti AMP
Extreme, ASUS ROG Strix Z270H, 16 GB HyperX Fury DDR4, Samsung 850 EVO 500GB, Corsair Force MP500 240GB M.2, 34" Ultra Wide Samsung Monitor
User avatar
imnew
 
Posts: 2456
Joined: Tue Aug 25, 2009 1:41 pm

Re: Who is building what ?

Unread postby bnsfsubdivision » Sun Dec 30, 2012 8:44 am

Route: BNSF California Division
Route: BNSF Mojave Subdivision (Barstow to Bakersfield)
Length: 136.7 Miles
Prototypical: DEM and RWDecal used in route along with dvds, pictures and other sources.
Completion: about 1/4 done

Link to screenshots and work in progress threads.

viewtopic.php?f=31&t=6325
Kevin Schulz
Artist - Searchlight Simulations
User avatar
bnsfsubdivision
 
Posts: 822
Joined: Sun Feb 20, 2011 5:27 am

Re: Who is building what ?

Unread postby dazzharvey » Sun Dec 30, 2012 9:59 am

Route: Montrose to Broughty Ferry Scotland
Completion: Beta should be out by Spring 2013 with a view to complete soon after
Future expansion: Completing the route from Dundee to Aberdeen. est 2013/14

Decals, route build and painting the land was the easy part, still learning to build models and re-texture them, complete novice still but working on it.
I7 2600k running at 4.6ghz
240Gb Solid State Drive & 2Tb HDD
Dark Nickel Plated Quiet Heatpipe Cooler
MSI Z68A-GD55-G3
16GB 1600MHz DDR3 RAM
VTX Radeon HD 6770
Aerocool touch 2000
Copy of Railworks - - I'm sorted :D
User avatar
dazzharvey
 
Posts: 205
Joined: Fri Sep 02, 2011 3:02 am
Location: Perth, Scotland

Re: Who is building what ?

Unread postby buzz456 » Sun Dec 30, 2012 1:12 pm

arkansasstormchaser wrote:I'm working on a route, I don't know if I will ever release it tho. !**conf**! It's a good work in progress. Learning lots.

Route: Norfolk Southern & BNSF route. Freelanced route.

Miles: Have over 80 miles total of track work, don't know how long I will go.

Pictures:
Can be found on it's Facebook page.

http://www.facebook.com/FreelancedTrainSimulatorRoute

-Clayton


Pretty nice.
Buzz
39 and holding.
"Some people find fault like there's a reward for it."- Zig Ziglar
"If you can dream it you can do it."- Walt Disney
Image
User avatar
buzz456
Site Admin
 
Posts: 21019
Joined: Sun Mar 21, 2010 8:30 am
Location: SW Florida

Re: Who is building what ?

Unread postby Derek » Sun Dec 30, 2012 2:52 pm

100 miles or so from Durham to Darlington via Bishop Auckland/Barnard Castle/Crook and Wearhead set in about 1953, but I am relaxed about the time frame, I just wanted a nice network (thanks bob).

http://1.bp.blogspot.com/-H-0zTDIpbNc/UI8cXsLDqwI/AAAAAAAAB1M/XJc5_vm5uGA/s1600/Plan291012.jpg

http://dereksiddle.blogspot.co.uk/

Been on with it for ages, but mostly loving it.

d
Last edited by Derek on Sun Dec 30, 2012 2:55 pm, edited 2 times in total.
User avatar
Derek
 
Posts: 392
Joined: Fri Feb 13, 2009 1:35 pm

Re: Who is building what ?

Unread postby thecanadianrail » Sun Dec 30, 2012 2:52 pm

Route 1

Route: RMR East and West Subdivisions
Railways: RMR (Rocky Mountain Railroad), BNSF, CN, UP
Fictional: Dem is used from the area between Denver CO, and Vail CO.
Length: Unknown as of now
Completion: 1/4 of all track placed, about 1/2 way from first release of the eastern half of the west subdivision.
Assets used: a lot of payware and freeware stuff, Scale rail used for rails.

Link: no thread created yet.

Route 2

Route: MRL Mainline between Missoula and Thompson Falls
Railways: MRL, BNSF
Prototypical: Dem, RWDecals, photos, videos, google streetview
Length: I don't remember the number.....
Completion: Early phases, dem is complete but still gathering other information before I start laying track.
Assets used: going to try and keep this using the default assets and the RCAP assets.
Link: no thread yet.
User avatar
thecanadianrail
 
Posts: 2613
Joined: Fri Oct 29, 2010 8:36 am
Location: Manitoba, Canada

Re: Who is building what ?

Unread postby Rich_S » Sun Dec 30, 2012 4:40 pm

I'm still working on my Montour route. The Montour was a coal hauling railroad here in Southwestern Pennsylvania. The majority of the Mines served by the Montour Railroad were owned by CONSOL. The route also contains very small portions of the P&LE mainline in Coraopolis, PA. The Panhandle route of the PRR/PC/CR railroads at McDonald, PA, the P&WV/N&W/W&LE railroads at both George, PA and Salida, PA, The Chartiers Secondary / Washington Secondary of the PRR/PC/CR/P&OC at Hills Station, PA, the B&O railroad at Snowden, PA and the Union Railroad at West Mifflin, PA. Once the Montour is complete, my next phase will be the P&WV railroad between Connellsville, PA and Pittsburgh Jct, OH. If I'm able to finish the P&WV, the third phase will be the Panhandle between Mingo Jct. OH and Scully Yard, Carnegie, PA. A current beta version of the route is in the Railworks America file library.


Regards,
Rich S.
Cheers,
Rich S.
User avatar
Rich_S
 
Posts: 708
Joined: Tue Aug 24, 2010 11:19 pm
Location: Baden, PA, USA

Re: Who is building what ?

Unread postby shicoe30 » Sun Dec 30, 2012 11:47 pm

Route: Canadian Pacific Watertown Subdivision
To and From: Milwaukee, WI - Portage, WI
Length: About 100 Miles
Progress: Track 35%, Scenery 9% (Currently on hold until April)
Info: Prototypical Route based in 2011-2012. Former Milwaukee Road then SOO, now under E.H.H. and his slimmed down, GE packed Canadian Pacific.
Link: http://railworksamerica.com/forum/viewtopic.php?f=31&t=6788

Route: Aspinwall Railway (Previously Unannounced)
To and From: Granville - Aspinwall - North Rock
Length: 13 Miles
Progress: Track: 90%, Scenery 12%
Info: Freelance Shortline. A small island route based (very) loosely off of Madeline Island, WI (if it were to have a railroad on it!). Main freight is coal from the mainland, to fuel the small coal power plant that provides electricity to the island. Some lumber business, a couple of carloads a week from a small factory, and the occasional tank of aviation fuel. This is the route that my last few posts in "Any Route, Any Era" have been from. Has been kind of a pet project, and the size makes it more like a model railway than a real route, but that's not to say it doesn't have depth, a coal run (8 miles from dock to dump) can take almost an hour. No payware used so far, and I'd like to keep it that way.
Link: Coming Soon!
User avatar
shicoe30
 
Posts: 440
Joined: Fri Mar 04, 2011 2:24 pm
Location: Milwaukee, Wisconsin

Re: Who is building what ?

Unread postby NS9030 » Mon Dec 31, 2012 12:22 am

Route: NS Fostoria District
To: Bellevue, OH
From: Fort Wayne, IN
Length: Roughly 120 Miles
Progress: 9% Track 1% scenery (Computer crash !*not-ok*! )
Discription: This former Nickel Plate Road mainline now belongs to Norfolk Southern. Trains on this line can be coal, roadrailers, intermodal, autoracks, and freight. Up to 20 trains a day are ran on this line including 3 locals. UP, BNSF, and CSX are sometimes seen on this line but WC, IC, WE, CP, CN, and SOO have made occasional appearances.
"CSX 376 clear Tontogany, K18519 out"
NS9030
 
Posts: 528
Joined: Mon Sep 26, 2011 7:14 pm
Location: BE 181.6 CSX Toledo Sub

Re: Who is building what ?

Unread postby NDORFN » Mon Dec 31, 2012 2:03 am

Route: Caldwell County Railroad.

Stage 1: NS interchange, Hickory NC to Sealed Air, Valmead & CHH Pulp Mill, Lenoir.

Stage2: Salisbury NC including the North Carolina Transportation Museam via the Southern Loops at Old Ford NC to Ashville NC.

Surprise: Comes with stage 2... but you'll have to find it in freeroam.

Length: Stage 1: Roughly 25 miles, Stage 2: No idea. Fairly long! Stage 3: Really short!

Prototypical: 1/9 arc terrain data, RW decals, Google satellite & street View, Railpictures.com, Joey Bowman photographer from Hickory NC, and the crew from Caldwell County Railroad.

Progress: Stage 1: Track 99%, Scenery 5%, Stage 2: Track 1%, Scenery 1% Surprise: Track 0%, scenery 0%

History: Stage1: The Caldwell County Railroad was started in 1994 when the Caldwell County Economic Development Commission bought the line from NS. The line was once a narrow gauge railroad, The Chester & Lenoir, hauling lumber out of the mountainous forests north of Lenoir. The line was converted to standard gauge in the early 1900's and became the Carolina & North Western, eventually absorbed into Southern. The line was truncated in 2007 due to Google building a server farm adjacent to the track in Lenoir, ironic for me since I used Google extensively to help create the route! Stage 2: Known as the S-Line, a secondary mainline of the Norfolk Southern, runs between Morristown, Tennessee and Salisbury, North Carolina. Not sure on the history of the line yet but this is getting boring so... moving on. Surpise: Let's just say it's really old AND really young.

Operations: Set in 2015. The Caldwell County Economic Development Commission has generated a boom in the local furniture industry with tax incentives and financial aid and the new CHH pulp mill has resulted in investment in the line from NS and solid a solid revenue earner for them. Also they reminded Google that they're not God and reopened the line past the server farm.
CCRY - Typical shortline switching the length of the line from NS interchange in Hickory. Lenoir chapter of NRHS - Restaurant/Picnic train operationg out of Lenoir to an area north of Valmead hauled by restored C&NW RS-11. Norfolk Southern - 8 times daily 30-35 car trains & occasional wood chipper + chemical cars to/from CHH pulp mill in Lenoir. Not telling the name of the operator in the surpise because it will give it away but let's just say that they operate in circles.
Last edited by NDORFN on Tue Jan 01, 2013 1:42 am, edited 2 times in total.
NDORFN
 
Posts: 1231
Joined: Mon Nov 28, 2011 8:12 pm
Location: Matamata, New Zealand

Re: Who is building what ?

Unread postby PapaXpress » Mon Dec 31, 2012 2:14 am

Route: California Capital Corridor
Length: 185+ miles
Prototypical: DEM and RWDecal circa 2006
Completion: Far from complete

Link to screenshots and work in progress threads.
http://thegradecrossing.blogspot.com/
Image
"Just post some random unrelated text. We have members here who can help you with that." ~ Chacal
"When all else fails, read the instructions... if that doesn't work either, try following them." ~ Old Prof
Image
The Grade Crossing - Atlanta North Project - Virtual Rail Creations
User avatar
PapaXpress
 
Posts: 5147
Joined: Sat Oct 23, 2010 10:30 pm
Location: that "other" timezone

Re: Who is building what ?

Unread postby thebigroyboyski » Mon Dec 31, 2012 8:49 am

Route: NS/Conrail Lititz Secondary and Lancaster Area
Length: Lititz Secondary 14 miles, Columbia Secondary and part of the Keystone Corridor also covered approx 30-40 miles.
Prototypical: DEM, RwDecal, Bing birds eye, photos and you-tube used. Modern day and early 80s versions.
Completion: Dillerville Yard to Lititz track 100%. Scenery 50%. Columbia Secondary Track 50%. Scenery 0%. Lancaster Station to Elizebethtown track 100% Scenery 10%.

The route uses a mix of DLC and 3rd party content with Scalerail track and uktrainsim textures used.
I should hopefully get a beta released by the summer.
I'm making two versions of the route as I want to build a modern branch but I also want to model the area when I visited it as a wee boy chasing the Conrail geep with my dad.
Pictures to follow.

Route: Part CP mountain and Laggan Subs
Length: About 100+ miles
Prototypical: DEM, RwDecal, Google Earth Street View, pictures and you-tube used. 90s to modern day.
Completion: Field to Golden track 75% scenery 5%. Field to Banff via Spirral Tunnels track 40% scenery 0%.

This is my back up route I started when I had problems with my other one.
I keep adding to it now and again but it is a long long way from release.
Frontrunner in the file library now!
User avatar
thebigroyboyski
 
Posts: 579
Joined: Mon Jan 09, 2012 5:19 pm
Location: Ayrshire, Scotland

Re: Who is building what ?

Unread postby nssd80mackid » Mon Dec 31, 2012 2:25 pm

Route:Norfolk Southern Pittsburgh Line
Miles:Dont know. Maybe Altoona to Pittsburgh
0% Done didnt start yet
CPU- Ryzen 7 3700x
Ram- Corsair RGB Vengeance 32 GB 3600mhz
GPU- Evga RTX 3080 FTW3
SSD- Samsung 860 evo 500GB
HDD- Hitachi 1TB
User avatar
nssd80mackid
 
Posts: 344
Joined: Fri Aug 17, 2012 5:04 pm
Location: New Jersey

Re: Who is building what ?

Unread postby artimrj » Mon Dec 31, 2012 4:38 pm

Route: 3 Rivers
Area: Using Pittsburgh DEM from an old RWA community project.
Type: Fictional

3 shortlines, lots of industries and passenger station and about 200 miles of track due to the way things run.

Major track is laid out, several small areas are being worked on. The 3 rivers have water in them. 40 bridges uses so far. Towns have been named.

Worked stopped for a bit while I got the RWA transferred over to my server and a few sad things happened in my life and since the world is still here, 2013 will renew construction on it. I have 3 other people working it with me at this time.
Bob Artim - Generation X²
I don't have a PHD, I have a DD214... Freedom carries sacrifice
I'm crawling in the dark looking for the answer
User avatar
artimrj
 
Posts: 4721
Joined: Sun Jan 31, 2010 3:07 pm
Location: Beaver, Pennsylvania

Re: Who is building what ?

Unread postby Csxgp38-2 » Mon Dec 31, 2012 5:04 pm

Route: HSM Co Transportation Piedmont Division
Route: HSM Co Martin Shops-Many fictional towns
Length: Still working on, should be around 30 miles or so of winding trackage.
Freelanced: Fictional towns and trackage, will interchange with CSX/NS at real NC towns.
Completion: Track work through Connors Creek and one still to be named town complete, scenery is 70% on current, enlarging shops.
-Harrison
CSX railfans are how tomorrow moves!
Future owner of HSM Co Transportation- Rolling into the future.
"If I could return to those boyhood days of mine, and that green light on the Southern, Southern railroad line."
Csxgp38-2
 
Posts: 732
Joined: Sat Sep 10, 2011 9:18 pm
Location: Apex, NC- Seaboard Country

Next

Return to General Discussion

Who is online

Users browsing this forum: Bytespider and 2 guests