by RudyardRailroader » Sun Dec 30, 2018 9:04 pm
I've been operating and modifying the Lakeside Route for over a year now. Like a model railroader, I often find myself adding to the route more than I run trains over it. I almost wish it was a tangible model railroad so I could host operating sessions, as I rarely have enough time to do anything more than get a train from point A to point B before I have to quit and deal with the real world. With a new job I barely even have time to do that anymore. Luckily the holidays have allowed me enough time off to make some modifications to my 1956 Lakeside Route, welcoming in the virtual 1957 New Year.
You do not have the required permissions to view the files attached to this post.
Last edited by
RudyardRailroader on Sun Dec 30, 2018 9:55 pm, edited 9 times in total.