Modifying yards at Waterton

Discuss modifications for anything for the RW&A Lakeside route and assets.

Moderator: ricksan

Modifying yards at Waterton

Unread postby ozinoz » Sat Jun 28, 2014 1:32 am

I had a bit of spare time and thought I would add a connecting track / switches to the yards at Waterton so they could be accessed / switched from either end. The problem I am having, and I am sure this will be a noob issue, is getting the switches to render. I have downloaded and watched numerous tutorials and it looks fairly straight forward. Even using snap to track, I can not get the second switch to render / track to join - it just lays over the top/ No matter how long I make the switch, it will just not join. !**duh*!! Is there some secret password / funny handshake required? **!!bang!!**

!*cheers*!
ozinoz
 
Posts: 1626
Joined: Fri Feb 20, 2009 1:59 am
Location: Antipodes

Re: Modifying yards at Waterton

Unread postby GreatNortherner » Sat Jun 28, 2014 4:40 am

Hi,

The reason behind the switches not rendering could be that you've selected the wrong track rule when laying the tracks. To avoid editing issues, not only with switch rendering, all tracks should use the very same track rule from the pulldown menu on the bottom left flyout window before placing tracks and especially switches.

Cheers
Michael
User avatar
GreatNortherner
 
Posts: 1586
Joined: Sun Feb 15, 2009 11:19 am
Location: Czech Republic


Return to RWA Route & Asset Modification

Who is online

Users browsing this forum: No registered users and 1 guest