Just took this one a few minutes ago in a scenario I am working on. Here, the 44 tonner has not yet been repainted to RWA colors, as it had been delivered a few days ago and has been undergoing a top to bottom inspection. This is the first work it will be doing for RW&A
1. You will have to pull the 44 tonner out of the roundhouse
2. sort out a train that was sitting on the arrival/departure track
3. grab some empty coal hoppers from the sorted train, and one from under the coal tower and load them,
4. spot one of the loaded cars under the coal tower
5. return the loaded cars to a yard track
6. grab an empty gon and tie it onto the work train
7. head down to Adkins and drop the rear 4 cars in the siding
8.take the gon and load it at Johnsson quarry
9. tie the loco and gon back onto the train
10. head out to N. Adkins and drop the work train on the siding
11. deadhead back to Waterton
12. pull the coach out of the roundhouse and spot it at the depot
13. refuel the loco
14. put it back in the roundhouse
In the free roam I am using to see if this will be too frustrating, this scenario has taken me about 1.5-2 hours at the least, and 3 hours at the longest when I was figuring out what I want to do.
I have a few more of an AT&N connie on a plow train I'll have to dig up later. I can't seem to get the RW&A connies to work, same with the 44 tonner. I've followed the directions to the letter, too! I can't find the GeoPCDX file for the connie tender, even when I go where it tells me to, and the couplers on the 44 tonner don't show up and it doesn't respond to keyboard controls.