Speaking of rail served power plants, is merry-go-round operation possible? I.e. the train being unloaded while slowly moving over a discharge chute? So far any loading/unloading scenario I've played was a single car at a time, quite tedious when there are like 120 in a coal train.![]()
When coal gondolas are being used instead of bottom discharge hopper cars, we need a model of a rotary dumper. Or just assume the gondolas are being turned over when passing through a building of sufficient size to hide any machinery that might be inside.
Users browsing this forum: Railfan722 and 3 guests