


Route Description
Operate Amtrak's Acela Express and Northeast Regional services between New Haven and Boston, MBTA commuter rail service between Wickford Junction and Boston, as well as Shore Line East commuter rail service between New Haven and New London.
Route Length: 156.4 miles (between mileposts 72.3 and 228.7)
Relevant Companies: Amtrak, Massachusetts Bay Transportation Authority, Shore Line East
Maximum Line Speed: 150MPH (Acela Express), 125MPH (Northeast Regional), 79MPH (MBTA)
Station Stops: New Haven Union, New Haven State St., Branford, Guilford, Madison, Clinton, Westbrook, Old Saybrook, New London, Mystic, Westerly, Kingston, Wickford Junction, T.F. Green Airport, Foxborough (Gillette Stadium), Providence, South Attleboro, Attleboro, Mansfield, Sharon, Canton Junction, Route 128, Hyde Park, Ruggles, Boston Back Bay, and Boston South Station
Features
- Over 156 miles of superelevated track with accurate track speeds and gradients.
- Overhead catenary and real-world terrain.
- Accurately-placed signals, interlockings, and mileposts.
- Catenary dead sections, defect detectors, impedance bonds, and ACSES transponders.
Release Channel
The "Release Channel" is where stable, playable versions of the route are published. While playing the release version of the route, you can expect that all track, signalling, and platforms are in place. The Release Channel is not updated very frequently because the Preview Channel is where most of the development takes place. Once a build in the Preview Channel has become stable, it will then get published to the Release Channel.
Subscribe to the Release Channel




Preview Channel
The "Preview Channel" is where the absolute latest versions of the route are published. It is meant for users to see and test what is being worked on in between major content releases. While playing the preview version of the route, DO NOT expect that all features are included and working properly. The Preview Channel is updated very frequently as it is where all the development takes place. Once a build in the Preview Channel has become stable, it will then get published to the Release Channel.
Subscribe to the Preview Channel



