Design: Frank Hemmelder (http://hemmelder.com)
Route:- North Eastern - PA Div
Scenario:- NEPA-FHPG-007_Standstill
Description: The MOW needs to come out, as there is an emergency at one of the bridges.
Briefing:
With a broken bridge all train traffic comes to a halt. Can you save the day?
Start Time: 19:32 (7:32 PM)
Duration: 30
Season: SEASON_SUMMER
The heavy rain has washed out part of a bridge and all rail traffic has grinded to a halt. Get the MOW engine and pick up gravel and some I-beams and get to the bridge as fast as you can. Be careful of all the traffic on the tracks, as there is a number of trains waiting to cross the bridge after the repairs are done.
Uses default NERW rolling stock and engines, including the latest and greatest NERW MOW engine. All stock available here: http://vnerrforums.com/nerw
Also needs (sorry about that, normally I only use NERW stock, but this one slipped through) the Golden Age GN flatcar 40' model
I can be found on the RWA forums or the North Eastern Rails Works forums on a regular basis. My username is wackyhuman.
My thanks go to all the people provising us with routes and equipment for Railworks 3.
To install: Load the RWP file into Railworks and enjoy the scenario. ZIP file includes readme, rolling stock list, scenery list, images and RWP file.
Have fun!
URL to file: http://railworksamerica.com/FileLibrary ... RW_FHPG007
