Coming Soon: Stevens Pass 1929-56

Announce your payware projects here. Place your payware screenshots here.

Coming Soon: Stevens Pass 1929-56

Unread postby GreatNortherner » Mon Aug 27, 2018 11:51 am

Hello,

Are you a fan of steam era railroading and early electric operations in the US? Do you like the modern day Stevens Pass route but always wanted to see what it might have looked like over half a century ago? Then we have good news for you:

Image

This new route is currently being created by the same team who built the first (modern) Stevens Pass route for Train Simulator: Rick Grout, James Friedland and me (Michael Stephan). The electrified Stevens Pass route is in its core a backdated version of our BNSF route, featuring track alignments and station layouts based on historic GN documents, custom built electrification, interlocking, block and train order signals, many new lineside structures and buildings, backdated towns, and of course rolling stock and locomotives appropriate for the period. This modestly priced payware route will ship with an all new model of GN's mighty and powerful Y-1 electric locomotives in green and Empire Builder livieres plus an assortment of freight and passenger rolling stock. Following the route's release, additional freeware scenario content will be released that uses extra freeware GN equipment such as Rick's Alco RS-1 or my EMDs -- and also a completely new GN S-class 4-8-4 locomotive that will be released as freeware around the route's launch.

More information is available on Rick's Website:
http://www.gtraxsims.com/


Three Routes in One
Our electrified Stevens Pass will include all the electrified trackage from the construction of the second Cascade Tunnel to the end of electric operations in the mid 1950s. The route runs from Skykomish as its western terminus to Appleyard in the east. The original alignment over the Pass via Martin Creek, Tye, and the first Cascade Tunnel has been modeled in our route, allowing you to model operations during the years of construction of the second tunnel and to the abandonment of the original alignment shortly after the opening of the second tunnel. Also included is the original aligment from Winton to Leavenworth through Tumwater Canyon.

Image

Future Expansion
Following the release of the electrified Stevens Pass, we will turn our attention to the remainder of the original route. A 'phase 2' of the electrified Stevens Pass route will be created and published at a later point, including backdated trackage and scenery from Skykomish to Everett and Delta Yard and of course also including the Northern Pacific and Milwaukee Road trackage along the GN in that area.

Cheers!
Last edited by GreatNortherner on Tue Aug 28, 2018 1:40 am, edited 1 time in total.
User avatar
GreatNortherner
 
Posts: 1586
Joined: Sun Feb 15, 2009 11:19 am
Location: Czech Republic

Coming Soon: Stevens Pass 1929-56

Unread postby TheRailWorkshop » Mon Aug 27, 2018 12:04 pm

Well, it is a great news !! !*YAAA*!
Last edited by TheRailWorkshop on Thu Aug 30, 2018 10:01 am, edited 1 time in total.
TheRailWorkshop
 
Posts: 49
Joined: Fri Aug 17, 2018 9:20 am

Re: Coming Soon: Stevens Pass 1929-56

Unread postby BNSFdude » Mon Aug 27, 2018 12:13 pm

Sweet!
Anthony Wood
Audio Engineer - Searchlight Simulations
User avatar
BNSFdude
 
Posts: 2722
Joined: Tue Nov 29, 2011 1:46 am

Re: Coming Soon: Stevens Pass 1929-56

Unread postby DanSSG » Mon Aug 27, 2018 12:19 pm

Looking forward for it *!lol!*
DanSSG
 
Posts: 191
Joined: Fri May 11, 2018 5:40 am

Re: Coming Soon: Stevens Pass 1929-56

Unread postby buzz456 » Mon Aug 27, 2018 12:30 pm

Excellent! This will be a great addition to a era sometimes neglected and a great iconic track.
Buzz
39 and holding.
"Some people find fault like there's a reward for it."- Zig Ziglar
"If you can dream it you can do it."- Walt Disney
Image
User avatar
buzz456
Site Admin
 
Posts: 20940
Joined: Sun Mar 21, 2010 8:30 am
Location: SW Florida

Re: Coming Soon: Stevens Pass 1929-56

Unread postby imnew » Mon Aug 27, 2018 12:46 pm

Fantastic news Michael!
Intel Core I7-7770K, ZOTAC GTX 1080 Ti AMP
Extreme, ASUS ROG Strix Z270H, 16 GB HyperX Fury DDR4, Samsung 850 EVO 500GB, Corsair Force MP500 240GB M.2, 34" Ultra Wide Samsung Monitor
User avatar
imnew
 
Posts: 2456
Joined: Tue Aug 25, 2009 1:41 pm

Re: Coming Soon: Stevens Pass 1929-56

Unread postby ex-railwayman » Mon Aug 27, 2018 1:01 pm

Wonderful, the TS2018 'A' Team does it again........ **!!bow!!** !!*ok*!!

Cheerz. Steve.
i7 10700k 3.8GHz Eight Core CPU, Gigabyte Z590 AORUS ELITE AX, 32GB RAM, nVidia RTX3060ti 8GB, WIN10 PRO 64-bit. 10TB HDDs in total.
ex-railwayman
 
Posts: 1203
Joined: Tue Jun 22, 2010 6:17 pm
Location: Nottingham, England

Re: Coming Soon: Stevens Pass 1929-56

Unread postby thegevo5k » Mon Aug 27, 2018 1:48 pm

This is fantastic! !*brav*! Is it coming to Steam?
thegevo5k
 

Re: Coming Soon: Stevens Pass 1929-56

Unread postby GERUNIMO625 » Mon Aug 27, 2018 2:05 pm

ex-railwayman wrote:Wonderful, the TS2018 'A' Team does it again........ **!!bow!!** !!*ok*!!

Cheerz. Steve.

I PITY THE FOOL, THAT DON'T BUY THIS ROUTE! *!greengrin!*

Outstanding as always gents! Can't wait!
!*salute*!
Jerry
User avatar
GERUNIMO625
 
Posts: 303
Joined: Fri Dec 18, 2015 9:54 pm
Location: Naperville, IL.

Re: Coming Soon: Stevens Pass 1929-56

Unread postby buzz456 » Mon Aug 27, 2018 2:23 pm

You guys rock.
Buzz
39 and holding.
"Some people find fault like there's a reward for it."- Zig Ziglar
"If you can dream it you can do it."- Walt Disney
Image
User avatar
buzz456
Site Admin
 
Posts: 20940
Joined: Sun Mar 21, 2010 8:30 am
Location: SW Florida

Re: Coming Soon: Stevens Pass 1929-56

Unread postby gtrtroger » Mon Aug 27, 2018 2:57 pm

This should be very special..... time to dust off all that GN Steam Power again.....
User avatar
gtrtroger
 
Posts: 1240
Joined: Mon Jun 30, 2014 7:31 am
Location: Montgomery, Alabama

Re: Coming Soon: Stevens Pass 1929-56

Unread postby RudiJaeger » Mon Aug 27, 2018 3:33 pm

My new favorite route and it isn't even released yet! !*drool*!
Thanks so much for doing this one; best wishes to all of you for a smooth and enjoyable production process. *!!thnx!!* !*cheers*!
CoolerMaster HAF case filled with a bunch of rapidly aging techno-stuff.
User avatar
RudiJaeger
 
Posts: 510
Joined: Thu Sep 28, 2017 10:55 am
Location: Colorado Springs

Re: Coming Soon: Stevens Pass 1929-56

Unread postby PNWR1854 » Mon Aug 27, 2018 5:10 pm

!*drool*! !*drool*!
PNWR1854
 
Posts: 525
Joined: Sat Dec 02, 2017 7:43 pm
Location: Pacific Northwest

Re: Coming Soon: Stevens Pass 1929-56

Unread postby ozinoz » Mon Aug 27, 2018 5:42 pm

!*drool*! **!!bow!!**

Just a question though - is this going to be available to those of us living outside the US, unlike the modern day Stevens Pass? !**conf**!


The world needs more steam era routes... !*brav*!

!*cheers*!
ozinoz
 
Posts: 1626
Joined: Fri Feb 20, 2009 1:59 am
Location: Antipodes

Re: Coming Soon: Stevens Pass 1929-56

Unread postby buzz456 » Mon Aug 27, 2018 5:50 pm

ozinoz wrote:!*drool*! **!!bow!!**

Just a question though - is this going to be available to those of us living outside the US, unlike the modern day Stevens Pass? !**conf**!


The world needs more steam era routes... !*brav*!

!*cheers*!

It will be available outside the US.
Buzz
39 and holding.
"Some people find fault like there's a reward for it."- Zig Ziglar
"If you can dream it you can do it."- Walt Disney
Image
User avatar
buzz456
Site Admin
 
Posts: 20940
Joined: Sun Mar 21, 2010 8:30 am
Location: SW Florida

Next

Return to Payware Announcements and Screenshots

Who is online

Users browsing this forum: PetalBot and 1 guest