thecanadianrail wrote:what is included in this patch?
Fraser and Cariboo Route Patch 1.01
This small patch should fix correctly name the Lillooet Yard Tracks so there are no longer 2 siding named
Lillooet Yard Track 5 as well as some other minor things. Also included are 5 more scenarios outlined
below.
06. SQPG North Duration: 2 hours
This scenario starts at Lillooet and you take the SQPG train north to Chasm almost the full length of the
route. Before leaving Lillooet you have some switching to perform.
07. Northbound Local Duration: 2 hours 30 minutes
This scenario starts at Lillooet and you first have to make up your train in the yard before heading north.
You will have some switching to do on route before arriving at 70 Mile House.
08. Down the Canyon Duration: 55 minutes
This scenario starts in the siding at Moran and tests your dynamic brake skills on a heavy train to
downgrade to Lillooet.
09. Switcher and Work Train Duration: 50 minutes
This scenario starts at Lillooet and you first have to go to collect some wagons from the Lumber Mill before
picking up a work train to take to a work site.
10. Cariboo JOSQ Duration: 50 minutes
This scenario starts at 70 Mile House and you take the southbound JOSQ to Kelly Lake.