
Like I said the model is almost done, the beta picture above pointed out some modeling errors I need to correct, but that is a small matter. The question is, should I pursue this further or just drop it due to the engine stability issue? There are connection points on the turntable for 48 tracks. If the route builder wanted to take the time to add a track at all 48 locations, then you could turn the Big Boy engine one track at a time and probably be successful. Otherwise, the engine will tilt off if you try to skip a track.


then it is varying from route to route (or asset) because in Bath Green Park route, standart scenario "Bruised and Battered", the turntable goes directly to the connected track, overpassing another existing exit beside, with one single keypress (g). See and check, is easier than I try to explain what I mean...



I never played a scenario in which I was rotating on a turntable, I thought the behavior was the same.
But I have to confess that the cab sway whilst spinning is amazing especially when engine is about to derail. 

